- Prefab Houses[10]
- Villas[4]
- Sheds & Storage[1]
- Garden Sets[2]
- Garages[10]
- Metal Building Materials[2]
- Shower Rooms[10]
- Contact Person : Mr. Chen David
- Company Name : Ningbo Deepblue Smart House Co., Ltd.
- Tel : 86-574-83066356
- Fax : 86-574-86642341
- Address : Zhejiang,NingBo,No.69, Linchun Road, Yinzhou binhai Industrial Zone
- Country/Region : China
- Zip : 315145
low cost home
DeepBlue prefab villa is based on light gauge steel frame system with high performance finishing materials. The whole house can be assembled within couple of hours by 4workers.
How To Assemble On Site:
Design code:
(1)AISI S100 North American Specification for the Design of Cold Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for design of cold formed thin gauge sections published by BSI in the UK.
(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
Why Choose Light Gauge Steel Structure?
1)Lifetime for structure: 100 years.
2)Earthquake resistance: mix more than 8 grades.
3)Wind resistance:max 60m/s.
4)Fire resistance:all the materials used can be fire resistance.
5)Snow resistance:max 2.9KN/m²as required
6)Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.
7)High acoustic insulation:60db of exterior wall 40db of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean
10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.
11)Installation:the average is one worker one day install one SQM.
12)Installation guide:dispatch engineer to guide on site.
Technology Details:
Material Configuation:
No. | Item | Materials | Social house | No. | Item | Materials | Social house |
1 | Foundation | Fixing to Foundation | chemical bolt | 6 | Roof system | roofing | steel roofing sheet |
cushion tape between frame and foundation | asphalt tape | water-proof layer | NULL | ||||
2 | House Structure System | Main sturcture for house | 0.75mm thk *89mm wide Steel frame | strength board | NULL | ||
Floor Joist (if multi stories) | 0.75mm steel joist | Insulation/batt | low denisity glass wool | ||||
Connection | self-drilling scress | eaves board | 6mm MgO board | ||||
3 | Exterior Wall | Ext. wall Cladding | 9mm MgO board or steel cladding | downpipe system | PVC downpipe system | ||
Reinforce layer | NULL | 7 | Kitchen and bathroom | Kitchen cabinet | low cost cabinet | ||
Vapor barrier | low cost Vapor barrier sheet | wall cabinet | null | ||||
Insulation/batt | null | counter top | low cost arclic top | ||||
inter of ext .wall | 9mm plaster board | Sink | one bower stainless sink with faucet | ||||
4 | Interior Partition wall | siding | 9mm plaster board | toilet | low cost toilet | ||
cornering | NO | bathtub | no | ||||
Skirting | low cost Plywood and PVC | shower | low cost shower | ||||
5 | Floor System | sub floor for ground floor (Wet area ) | NULL | 8 | Doors and windows, plumbing | Exterior door | low cost steel door |
Sub floor for other floor ( Wet area ) | 18mm MgO | windows | PVC sliding windows | ||||
flooring for gound floor (dry area) | No | interior door | plywood door | ||||
flooring for gound floor ( wet area) | NO. | hot&cold water pipe | low cost PPR PIPE | ||||
Flooring for other floor (wet area) | low cost tile | Downpipe | PVC downpipe | ||||
Flooring for other floor dry area | low cost PVC flooring | 9 | Electrical system and multi media | telphone cable | prepunch whole | ||
Insulation | NULL | TV. CABLE | prepunch whole | ||||
Ceiling for dry area | 9mm plaster board | internet cable | prepunch whole | ||||
ceiling for wet area | 9mm plaster board | electrical cables | NULL | ||||
stairs (If have) | steel stairs | lighting | NULL | ||||
notice: | distribution box | NULL | |||||
1 | EX.W mean EX.works, pls find explaination from wikipedia | switch | NULL | ||||
2 | This price does not include foundation ,cement works and any other cost. | 11 | Others | INSTALLATION FEE | Optional | ||
3 | This price does not include design fee. | SUPERVISOR | Optional | ||||
4 | This price does not include any furnitures and others. | ||||||
5 | This price is only for listed materials | ||||||
6 | All electrical is based on Chinese standard equipments. | ||||||
7 | The total widnows area is no more than 15% of building area. The ceiling height is calculated 2.5m. | ||||||
8 | Final price need to be confirmed based on final drawings and order-confirm-letter. | ||||||
9 | If you have any questions, pls contact DEEPBLUE. |
ISO standard light gauge steel for main structure.one or two also three floors available.fireproof,heat insulation,wind and earthquake resistance.green,energy save. economically.
low cost home